Two routes: within a state, or across states
Intrastate supply means power generated and used in the same state, carried over that state's network. Interstate supply means power that crosses state lines over the national transmission network. A large user can buy from generators in either way, and many combine them.
Green energy open access
The Green Energy Open Access Rules, issued in 2022, let consumers buy renewable power directly. The eligibility threshold fell to 100 kW, from the earlier 1 MW, and amendments in 2023 allowed demand to be aggregated across several connections. The central rules set a 15-day approval window, but states differ: Maharashtra allows 30 days, and some states have no clear timeline.
Source: Renewable Watch, 2 July 2025.
The rules and charges differ by state
The central rules set standby charges at 25% of energy charges, but some states charge much more, up to 125% in Chhattisgarh and Andhra Pradesh. In January 2025 the Karnataka High Court struck down the central rules, reasoning that open access falls under state authority, and Karnataka issued its own regulations in March 2025. Charges and waivers have changed more than once, so any deal has to be checked against the rules in force at the time.
Why the mix matters for a data centre
A data centre runs around the clock, while solar and wind do not. One expert quoted by Renewable Watch argues that the market should move from intermittent green power toward dependable clean energy, with wind, solar and battery storage working together. For a campus, that points to a mix: generation close to the site, storage to even out the day, supply bought through open access, and the grid as a backup.
This is how we plan to source power at InduS.AI Ventures, through a mix of intrastate and interstate supply, with solar, wind and storage at the core of each campus.